The Beatty Road car park in Eastbourne is scheduled to close on 13 April 2026 due to significant safety concerns, including large potholes and uneven surfaces
Closure Details:-
- Location: Beatty Road car park, Eastbourne.
- Closure Date: Starting from 13 April 2026.
- Scope: The closure applies to both vehicles and pedestrians.
- Enforcement: Barriers and fencing will be installed. Any vehicles remaining in the car park after the closure date will be obstructed and unable to exit.
Reason for Closure:-
A spokesperson for Tobis Holdings stated the closure is necessary for "essential repair works" to address safety risks. The planned works include:
- Replacing the underground surface water drainage system and soakaways.
- Comprehensive resurfacing to fix deep potholes and uneven ground.
Access for Shops and Visitors:-
- Local Shops: All businesses in the area will remain open and accessible via designated footpath routes.
- Parking Alternatives: Visitors are encouraged to walk to the site or use lawful parking on nearby public roads.
- Duration: There is currently no confirmed reopening date, as the management may extend the period to ensure all safety standards are met.
Uckfield man sentenced for coercive control and assaults on woman in East Sussex
Drink-driver who crashed car into house is banned
Long term investment in Wealden’s leisure centres supports summer visitor numbers
Flooding forces Eastbourne roller-skating rink to close
£50,000 fundraising goal set for 'significant' Arlington Stadium repairs
Hailsham main road to remain closed for further five weeks as works move to second phase
Eastbourne MP to meet with new South East Water CEO to discuss 'ongoing challenges'
South East Water looking to repair leak in Eastbourne road ‘as soon as possible’